✅ The addition of earthwork transects provides more accurate cross-sectional information.
▎Add an earthwork crossing line
Earthwork Transect Menu Screen
- The Add Earthwork Transect button allows you to create a large number of line segments.
-
You can upload a csv file by clicking the
Add filebutton (up to 1GB) - 우측의
양식 가이드버튼을 클릭하여 업로드 파일의 양식을 확인할 수 있습니다.
Earthwork transect line CSV file form (sample)
✅ Earthwork transect CSV file form instructions
- Line: Please write a name to identify each line.
Select- There is no limit to the number of lines you can create.
- x,y: Each xy is the position (coordinates) of a point, so at least two pairs of xy's can be used to create a line segment. Enter the x,y coordinate system as numbers that match your project coordinate system.
Required
▎Managing earthwork crossings
- The earthwork transect tools you create are attributed to and managed by the project, not the field situation.
- You can toggle it on and off from the archive to a specific day's field conditions.
- You can toggle this on and off by clicking the
Earth Crossings checkboxin the left menu. You can selectively view only the earthwork crossings you want to see by clicking the checkbox for each earthwork crossing at the bottom.